| Data Centre in West London |
|
| The latest West London State of the Art, Carrier Neutral Data Centre to be completed and ready for occupation in September 2012. |
|
| With a total of five data halls over five floors providing a total of 1615 Square Meters of the state of the art technical space. The power infrastructure provides each Data Hall with a total density of 600KW with full resilience to meet the Uptime Institute Tier III standards. High Specification fire detection and suppression in each Data Hall and critical electrical rooms. |
|
| Total incoming power of 5MW to provide a floor density of 1,750 watts per square meter. Separate areas to accommodate High Density also available. |
|
| 24 x 7 manned security with Sophisticated Integrated CCTV, Access Control Management System (ACMS) and voice systems. |
|
| Each Data Hall is equipped with man trap and second level biometric authentication on entry. The building perimeter monitored by fixed and motion cameras. |
|
| The Data Centre infrastructure has been built in a modular, flexible and expandable manner such that enhancements or modifications may be readily accommodated during the life of the systems with effecting day to day performance and zero down time. |